Commercial Events
Demo dataOne front door for anything on site that might carry commercial or contractual consequence. Site reports it, the QS decides what it becomes.
Concrete obstruction broken out — pile cap excavation
Prototype suggestion based on the linked project record. The diary records excavation with a 22t 360 in an area where an obstruction was broken out. No live AI analysis has taken place and no contractual action is created automatically — a person decides whether this has commercial significance.
What happened
Pile cap excavation along the northern boundary encountered existing mass concrete which had to be broken out with the 22t 360 before the caps could be formed. Time and plant were recorded against the breakout.
Commercial interpretation: potential impact flagged as Cost, Time for review. This is a prototype commercial reading of the source record, not a statement taken from it.
Event detail
Where this came from
Source recordSource records are linked, not copied. Opening a link takes you back to the original site information.
Linked commercial records
Commercial records and values shown here are illustrative prototype data. Linked project source records are existing Shanco OS project records.