C343 · NSECH, Cramlington
Applications & Valuations
Demo dataBuild the monthly application, include agreed variations, record submission and certification.
Prototype only. Submitting an application here stores a demo snapshot — nothing is sent to the client.
C343-APP-07
Application 07 — July 2026
01/07/2026 – 31/07/2026 · due 05/08/2026 · prepared by Sarah Johnson (You)
Previous cumulative
£1,412,000
Measured work
£186,400
Variations
£18,400
This period
£204,800
Cumulative applied
£1,616,800
Measured work (demo build-up)
| Item | Description | This period |
|---|---|---|
| A100 | Site set-up and compound (demo) | £0 |
| B210 | Bulk excavation and muck away (demo) | £24,500 |
| B320 | Piling attendance and pile caps (demo) | £71,300 |
| C110 | Deep drainage and manholes (demo) | £42,600 |
| C240 | Ducting and service routes (demo) | £33,000 |
| D100 | External works and kerbing (demo) | £15,000 |
| Measured total | £186,400 | |
Variations included
- Concrete breakout to pile cap excavationC343-VO-001Evidence: Weak5 evidence gaps recorded against this variation.£18,400
Available to include
- C343-VO-002 — Substation works continuation and duct breakout
Submission
Submitted value
Not submitted
Submitted
—
Marking an application as submitted records a prototype snapshot and an audit entry. No document is issued.
Certification
Mark the application as submitted before recording a certified value.
Every inclusion, submission and certification on this application is written to the project audit trail, with links back to the originating site information.
Commercial records and values shown here are illustrative prototype data. Linked project source records are existing Shanco OS project records.